Ter'Green

Co-development of and co-investment in biomethane projects

Drawing on many years’ experience, we help you develop your projects, from compliance with relevant regulations to site construction and to operations management.

Ter'Green
Sycomore

Operating and maintaining

Since 2014, we have helped optimize the performance of biomethane plants. To do this, we offer services that leverage all operational drivers requiring concurrent management.

Sycomore
Teikei

Supply

As en environmental conscious company, we prioritize linking local biowaste producers with local biogas production sites in favor of a circular economy.

Teikei

Make the right decisions for optimum performance

Three key factors to consider before starting

Prior to launching the project, we carry out three vital studies to help you choose the biomethane system that is best suited to the type of feedstock you’ll use, the site and your operating limitations.


Biomass analysis


We analyse and identify the feedstock to determine the correct size of the plant. To do so, we use a database with the results of 1,500 analyses of 250 types of waste.


With the help of our partner SYCOMORE’s lab, we can carry out analyses (dry matter, organic matter, N, P, K, methane potential, etc.) or conduct pilot tests with specific feedstocks.

Plot analysis

Our teams assess the plot of land and ensure it’s suitable for your project.

We analyse the surface area, the type of soil and subsoil and the topography, and carry out geotechnical, hydrogeological and town planning studies.

Biogas recovery

We devise the best biogas recovery solutions for you based on the expected quantity of biogas produced and ease of access to the electrical grid or gas network.

Via injection

To produce biomethane, biogas is stripped of water, H2S and VOCs then compressed and purified. Following analysis, it can be injected into the gas network with operating pressures of between 4 and 70 bar. New technologies now make it possible to inject the maximum amount of biomethane and obtain purity levels of >99.5%. The flow range is from 50 Nm³/h to several thousand Nm³/h of injected biomethane.

injection

Via cogeneration

After being pre-treated to remove water, H2S and VOCs, the biogas is injected into a cogeneration motor, which produces both electricity and heat. The electricity can then be sold for a period of up to 20 years. The heat is used to maintain a constant temperature of 40°C in the tanks during the biomethane process or to heat livestock buildings, homes, commercial greenhouses and more.

Designing and configuring the plant

Our designs are based on 20 years of feedback and a portfolio of 90 operational plants. The equipment we advise using is tried and tested and we work our hardest to suggest solutions in line with your limitations. Each part of the process is developed and designed to best meet your needs.

1
Loading the feedstock
2
Pre-treatment and mixing
3
Hygienisation
4
Hydrolysis
5
Digestion
6
Post-digestion
7
Digestate treatment – storage
8
Biogas recovery

Looking to make savings? We’ve got you covered

naskeo_economiser_2

We design energy-saving plants that offer guaranteed reductions on operating costs throughout their lifetime.
We carry out thermal and electrical studies in the pre-project phase to establish future energy use and devise solutions to reduce it :
• Thermal study: gas holder insulation, sealing digester walls and apron, heat recovery, etc.

• Electrical study: modifying the motor insulation class, using frequency converters in the largest motors, changing the equipment settings, installing solar panels on the roofs for energy self-sufficiency.

We’re committed to reducing energy use in all of our projects.

At the end of the designing and configuring phase, our planning department will send through detailed plans for your future plant: site plans, 3D view, PID, etc.

Redesigning and modifying existing plants

Upgrading

We carry out audits of existing sites to establish the sizing and calculate the costs of any expansion or modernisation of your plant. With 20 upgrades under our belts, we can ensure your plant is as efficient as possible, tailored to your needs, profitable in terms of operating costs and scaleable.

Get in touch

Call us

Need help or have a question about your biomethane project? We're available from 8 am to 6 pm, Monday to Friday. Feel free to get in touch if you need our help.

+33(0)1 57 21 34 70

Come and see us

Want to meet us in person? 
You can find us at 52 rue Paul Vaillant Couturier - 92240 Malakoff or at 3 Rue Galilée - 44340 Bouguenais

See map

Send us a message

Want to find out more about our services? Send us a message with just a few clicks.

Send us a message
Let's talk about your project
Design - Naskeo